April 5th 2014
Duration: 9:00AM-4:00PM
Attendance: Jacob, Nate
got a lot of work done today. Starting out with a quick run to home depot with Nate we were able to pick up another sheet of 1/2" birch plywood to attempt to finish off the legs as well as some paints and misc. hardware for the legs.
a few notable things that got done this meeting
* Outer and Inner most parts of legs machined
* Inner square for legs glued
* Should hubs machined and glued together (made them 1" by using two 1/2" pieces instead of 3/4" due to not wanting to spend another $20 on a sheet of birch wood.)
* Skins cut out, sanded and test fit our 3d parts in some places
*Front Skins Attached for now (became a much bigger mess that i thought it would)
As for the skins i am very happy i did not attach the back skins yet because i realized i was jumping the gun and still need to drill my home for the pipe to fit through the body of R2.
~Jacob
Glue we used to attach skins |
Dome Ring made from 1/2" birch in progress |
Shoulders gluing in place. |
Inner part of leg glued into place |
Skins being cut out by Nate |
Make shift way to attach skins and hold them in place |